ADU Rules in California and San Jose: What Homeowners Should Know

California has made it much easier to add an accessory dwelling unit (ADU). State law sets rules that cities have to follow, and each city adds its own standards on top. Here's what those state rules say, based on the California Department of Housing and Community Development's ADU Handbook, updated in March 2026, plus what the City of San Jose publishes.

Size

A city can set size limits, but its maximum has to allow at least 850 square feet, or 1,000 square feet for an ADU with more than one bedroom. In a city without a compliant ADU ordinance, a new detached ADU can be up to 1,200 square feet. Cities can choose to allow larger ADUs.

Height

Cities have to allow a detached ADU at least 16 feet tall. That rises to 18 feet within a half-mile walk of a major transit stop or high-quality transit corridor, plus two more feet if needed to match the roof pitch of the main home. An attached ADU can go up to 25 feet, or the height limit of the main home if that's lower. A city doesn't have to allow more than two stories.

Setbacks

A city can't require more than four feet from the side and rear lot lines for an attached or detached ADU. An ADU created inside an existing living area or accessory structure doesn't need a setback at all.

Parking

A city can require no more than one parking space per unit or per bedroom, whichever is less, and it can be tandem on your driveway. A city can't impose parking requirements within a half-mile walk of public transit, among other exceptions. If you convert or demolish a garage to build your ADU, the city can't make you replace those spaces.

Who can live there

A city generally can't require you to live on the property. You can rent the ADU or the main home. An ADU generally can't be sold separately from the main home unless your city has adopted an ordinance allowing condominium sales or a narrow nonprofit exception applies.

Permit timing

If there's already a home on the lot, the city has to approve or deny a complete application within 60 days. In San Jose, the City says the first round of building review typically takes 20 business days, unless your plan needs additional review.

San Jose also offers preapproved plans, which are standard plans City staff have already reviewed. The City calls them its fastest and lowest-cost permit path. You still submit site-specific documents showing the ADU's location, utility connections and setbacks.

Fees

An ADU of 750 square feet or less of interior living space is exempt from impact fees. Above that, impact fees are charged in proportion to the size of the ADU compared with the main home. Building permit fees still apply, and San Jose may charge for other reviews your project needs, such as a geological hazard review or a tree removal permit. Ask for these numbers early, so they're part of your budget.

Prefab and manufactured homes

Under state law, an ADU can be a manufactured home. Factory-built units still need to meet your city's requirements on your lot, so check with your city or your contractor first.

Rules change, and every lot is different

This is general information, not legal advice. Confirm the details with your city before you plan around them. TLS Construction can go over what your property allows in a complimentary consultation. See Custom and Prefab ADUs or call 408-850-5090.