Building an ADU in Saratoga and Cupertino
Saratoga and Cupertino are neighboring South Bay cities, and each sets its own standards for accessory dwelling units (ADUs) on top of California law. TLS Construction has built ADUs in both, so we know what it takes to get one through permits and built.
ADUs TLS has built in Saratoga and Cupertino
We've built ADUs in both Saratoga and Cupertino.
We don't publish addresses or client names. For the other cities where we've built ADUs, see ADUs TLS Has Built Across the Bay Area.
Building an ADU in Saratoga
Saratoga's ADU rules are in Article 15-56 of the City Code, with a summary on the city's ADU page. Where the city's own documents disagree, we say so.
- How many. A lot with a single-family home can have one ADU and up to two junior ADUs (JADUs) inside the house or an existing accessory building, plus one new detached ADU.
- Size. An attached ADU can be up to half the main home's living area, capped at 1,200 square feet. A detached ADU can be up to 1,200 square feet. A JADU is up to 500 square feet and sits inside the walls of the house, which can include an attached garage.
- Height. A detached ADU can be 16 feet tall, or 18 feet near major transit, plus 2 feet for a roof pitch that matches the main home. An attached ADU can be 25 feet or two stories, or the main home's height limit if that is lower.
- Setbacks. A detached ADU must sit at least 4 feet from the side and rear property lines. The city's table gives attached ADUs the same 4 feet, but the code text sends them to the main home's setbacks (confirm with the city).
- Parking and looks. One space is asked for, but none is needed within half a mile of public transit, for a conversion, for a JADU, or when the ADU is applied for with a new house. A garage torn down or converted for the ADU does not have to be replaced. New ADU construction must match the main home's color, and new ADUs can't have roof decks.
- Rentals and fees. An ADU can be rented, but not for less than 30 days. Under the code, ADUs up to 750 square feet pay no impact fees; the city's table says 700 (confirm with the city). For JADUs the code requires the owner to live on site, while state law since January 1, 2026 requires it only when the JADU shares a bathroom with the house (confirm with the city).
- Fire and hillside. An ADU needs fire sprinklers only if the main home does. On a lot in a fire hazard severity zone, the plans must say so and the Santa Clara County Fire Department reviews them. Hillside lots and lots near creeks may need geotechnical clearance.
- Permit steps. Check the standards, email a building permit application to [email protected] once the plans meet the planning rules, then book inspections online. The city's August 2024 handout also describes a planning application and design review for taller or multi-story ADUs (confirm with the city). Planning is at 408-868-1222 and Building at 408-868-1240.
Building an ADU in Cupertino
Cupertino's ADU rules are in Chapter 19.112 of the Municipal Code, last updated in 2025 (Ordinance 25-2274). Some of the city's ADU web pages and handouts date from 2020-2021 and show older limits, so we went by the code text.
- How many. A single-family lot can have up to three ADUs in any mix of attached, converted, detached and junior ADUs.
- Size. A conversion of existing space has no size cap. A new ADU of up to 800 square feet goes through the city's streamlined path. A larger one can be up to 850 square feet as a studio or one-bedroom, or 1,000 square feet with two or more bedrooms, and a larger attached ADU can't exceed half of the existing home.
- Height and setbacks. A streamlined detached ADU can be 18 feet tall, or 20 feet near major transit to match the main home's roof pitch, and must sit at least 4 feet from the side and rear lines. A detached ADU over 800 square feet follows the accessory-building rules, including a 20-foot, one-story limit and at least 5 feet from the main house.
- Parking. Streamlined ADUs need no parking. A larger ADU needs one space only when the main home is short of its own required parking, and not within half a mile of public transit. A converted or demolished garage does not have to be replaced.
- Design. Larger ADUs in the Eichler, hillside, semi-rural, planned-development and Monta Vista areas must meet those areas' design standards, and an ADU can't have an interior door to the main house except a JADU that shares a bathroom.
- Rentals and fees. An ADU can be rented, but not for less than 30 days, and can't be sold separately. ADUs under 750 square feet pay no impact fees. The city code requires the owner to live on site for every JADU, while state law since January 1, 2026 requires it only when the JADU shares a bathroom (confirm with the city).
- Hillside and fire. The city's pre-approved plans are only for Valley Floor lots. We did not find ADU-specific fire-zone rules on the city's pages (confirm with the city).
- Permit steps. An ADU needs a building permit. You can email preliminary plans to [email protected] for a free early review, then file the permit online. City Hall's main line is 408-777-3200.
What state law guarantees in both cities
These rules come from California law, so they apply in Saratoga and Cupertino alike:
- A city's size limits must allow at least an 850-square-foot ADU, or 1,000 square feet with more than one bedroom.
- A detached ADU can be at least 16 feet tall, or 18 feet within a half-mile walk of major transit, with up to 2 more feet to match your home's roof pitch.
- Side and rear setbacks can't be more than 4 feet.
- An ADU of 750 square feet or less pays no impact fees. A larger one is charged in proportion to its size compared with the main home.
- The city has to approve or deny a complete application within 60 days when there's already a home on the lot.
- A junior ADU (JADU) can be up to 500 square feet. A city can require the owner to live on the property only when a JADU shares a bathroom with the main home.
- A manufactured home can be an ADU.
Custom or prefab?
TLS builds custom ADUs on site and can also sell and install manufactured ADUs. A prefab unit needs a clear path for delivery, while a custom ADU can fit lots that are narrow or hard to reach. We'll tell you which one works once we've seen your property. See manufactured and prefab floor plans or Custom or Prefab ADU: How to Choose.
How a project with TLS begins
- Consultation. We meet, walk the property and talk through what you want to build and your budget.
- Design. Plans are drawn for your lot, with the engineering and city requirements worked in.
- Permits. We prepare and submit what your city needs. Permit fees are separate.
- Construction. We build the ADU and manage the city's inspections through final sign-off.
Planning a larger project? We also build custom homes and estates on the Peninsula. See New Custom Homes and Estates, or our room additions.
Rules change, and every lot is different
This is general information, not legal advice. Confirm the details with the City of Saratoga or the City of Cupertino before you plan around them. TLS can go over what your property allows in a complimentary consultation. Call 408-850-5090 or see Custom and Prefab ADUs.
Sources
- California HCD: ADU Handbook (March 2026)
- City of Saratoga: City Code Article 15-56, Accessory Dwelling Units
- City of Saratoga: Accessory Dwelling Units page and development standards